Ant colony optimization based algorithm for solving scheduling problems with setup times on parallel machines
In this paper, a production scheduling problem with sequence-dependent setup times on a set of unrelated parallel machines is addressed. The objective function is to minimize the total setup time . An algorithm based on ant colony optimization combined with a heuristic is proposed for solving large...
Elmentve itt :
Szerzők: |
Mihály Zsolt Sentes Zsombor Lelkes Zoltán |
---|---|
Testületi szerző: | Conference of PhD students in computer science (11.) (2018) (Szeged) |
Dokumentumtípus: | Könyv része |
Megjelent: |
2018
|
Sorozat: | Conference of PhD Students in Computer Science
11 |
Kulcsszavak: | Számítástechnika, Algoritmus, Programozás |
Online Access: | http://acta.bibl.u-szeged.hu/61800 |
Hasonló tételek
-
Schedule on parallel machines in the case of individual machine-set [abstract] /
Szerző: Vaik Zsuzsanna
Megjelent: (2004) -
Minimizing the number of tardy jobs on a single machine with batch setup times
Szerző: Rote Günter, et al.
Megjelent: (1998) -
Combinatorial algorithms for the PNS and online scheduling problems
Szerző: Imreh Csanád
Megjelent: (2001) -
A PTAS for single machine scheduling with controllable processing times
Szerző: Schuur Petra, et al.
Megjelent: (2002) -
A parallelized sequential random search global optimization algorithm
Szerző: Ortigosa Pilar M., et al.
Megjelent: (1999)